EID Logo El Dorado Irrigation District FERC Project 184 Relicensing.

The El Dorado Irrigation District will be the Lead Agency for the preparation of  relicensing of the El Dorado Hydroelectric Project (Project No. 184)
What's New
Document Library
Project 184 Calendar
About Project 184
Current Water Data
.

.  

 

Forebay reservoir in Pollock PinesEl Dorado Hydroelectric Project

Owned and Operated by El Dorado Irrigation District Under Federal Energy Regulatory Commission License 184

Please see What's New for updates on project 184

.

 

Caples Lake drawdown and gate replacement
project is underway
Click here for more.

El Dorado Irrigation District began drawing down Caples Lake on Saturday, July 19, to prepare for the replacement of deteriorated outlet works at the Caples Lake main dam on Highway 88. The District emphasizes that the dam structure itself is safe. However, the outlet works were recently found to be in unsound condition and must be replaced. Click the link above for more information.

Click here to read a recent news release concerning the project.

 

 

What's New | Document Library | Project 184 Calendar
About Project 184 | Current Water Data
Search | Site Map | Feedback Form

 

Site Map Feedback Form Search